Description
We professionally manage the complex administrative process of obtaining your official PBG (Persetujuan Bangunan Gedung). As a legally certified design and engineering firm, our qualified architects and structural engineers use their SKA (Sertifikat Keahlian) to formally endorse, certify, and submit all required technical documents. This professional certification is a legal prerequisite for approval, demonstrating to the authorities that your design is safe, compliant, and validated by a licensed expert.
Benefits
Peace of mind and a faster start to construction. We navigate the bureaucracy for you, ensuring your project is fully compliant with all local laws and regulations, avoiding legal delays. Our professional, SKA-certified preparation minimizes the risk of document rejection or multiple revisions, allowing you to start construction faster.
-
Full Legal Compliance
-
Avoid Costly Delays
-
Complete Peace of Mind
-
Securing a legal PBG protects your investment
Info Areas
Key Scope & Services
- Preparation of all administrative and technical documents
- Official certification (signing) with our professional SKA
- submission to the government's Online Single Submission (OSS) and SIMBG systems
- All liaison with local technical agencies.
Sustainability & Wellness
- This service ensures your project formally complies with all local environmental
3 +
Years
Experience
20 +
Client
Count
25 +
Succeeded
Projects
5 k+
Working
Hours
Project agent
- Bima Putra
- halo@dariarchitect.com
- +62 819-9090-7803
Perfect Planning
We maintain an up-to-date, expert knowledge of all national (SNI) and local (Bali/Denpasar) regulations. Our technical documents are prepared to be "permit-ready" from the start to minimize revisions.
Approach
"Meticulous & Proactive." We treat permit application as a core technical discipline, not just paperwork. We anticipate regulatory questions and prepare clear, comprehensive, and professionally certified documents.
We Can Help!
What is the difference between IMB and PBG?
IMB (Izin Mendirikan Bangunan) was the old permit. It has been replaced by PBG (Persetujuan Bangunan Gedung). The goal is the same—to ensure your building is legal and safe—but the application process (now via the Online Single Submission system) is different.
Why do I need you to handle this? Can't the contractor do it?
The PBG application requires highly detailed technical documents that must be certified by a professional with an SKA. As your integrated designer, we provide this certification, ensuring the documents perfectly match the design and meet all codes, which a contractor cannot do.
Does your service guarantee the permit will be approved?
We guarantee that the technical documentation we prepare and certify with our SKA will be complete, professional, and fully compliant with all building codes and zoning laws. While final issuance timing is up to the government, our professional preparation ensures the smoothest and fastest possible path to approval.
How long does the permit process usually take?
This can vary significantly depending on the government's workload and your project's complexity. Our role is to ensure there are no delays from our side by submitting a perfect, comprehensive application from the very beginning.
Capabilities
- Official SKA (Sertifikat Keahlian) Certification for Architecture & Engineering
- In-depth knowledge of Indonesian National Standards (SNI)
- Expertise in local zoning laws
- Proficiency with the Online Single Submission (OSS) & SIMBG systems
Work Process
- Phase 1 (Audit & Certification)
- Phase 2 (Submission)
- Phase 3 (Monitoring & Issuance)
Let's discuss
- +62 819-9090-7803
- +62 851-5661-5270
- halo@dariarchitect.com
- INDONESIA
- Bali, Lombok